Effective Load Carrying Capability (ELCC)

As part of the process to implement the Effective Load Carrying Capability (ELCC) proposal developed by the Capacity Capability Senior Task Force (CCSTF) and endorsed by the Markets & Reliability Committee and Members Committee on Sept. 17, 2020, PJM requires generation owners of ELCC resources to provide specific information about their resources. This information is then used by PJM as input into the ELCC model.

In addition, PJM will post results and supplemental material about the ELCC process on a regular basis.

Study Results

Date
2025-2026 BRA ELCC Class Ratings PDF 3.13.2024
ELCC Class Ratings for 2023-2024 3IA, 2025-2026 BRA and 2026-2027 BRA PDF  1.6.2023
ELCC Report for December 2022 Results PDF  1.6.2023
ELCC Class Ratings for 2024-2025 PDF  12.29.2023
ELCC Report for December 2023 Results PDF  12.29.2023
2025-2026 BRA Data Files
The following data files are described in this document PDF
Assumed Resource Mix XLS
Temperature Bins XLS
Hourly Load Scenarios XLS
Hours and Weights for Peroformance Adjustment Calculations XLS
Performance Adjustment Statistics XLS
Weekly Modeled Planned and Maintenance Outages  XLS
 3.19.2024
2024-2025 Data Files
The following data files are described in the above ELCC Report:
Available Unlimited Thermal Scenarios: Years 0-10 ZIP
Load Scenarios: Years 0-5 | Years 6-10 ZIP
Replications LOLE: Part 1 | Part 2 | Part 3 | Part 4 ZIP
 12.29.2023
Variable Resource Hourly Shapes CSV   12.29.2023
200CPx2 Hours XLS   12.29.2023
2023-2024 3IA Data Files
The following data files are described in the above ELCC Report:
Available Unlimited Thermal Scenarios: Years 0-9 ZIP
Load Scenarios: Years 0-4 | Years 5-9 ZIP
Replications LOLE: Part 1 | Part 2 | Part 3 | Part 4 ZIP
 12.29.2022
Variable Resource Hourly Shapes CSV   5.16.2023
200CPx2 Hours XLS   12.29.2022
2026-2027 BRA Data Files
The following data files are described in the above ELCC Report:
Available Unlimited Thermal Scenarios: Years 0-9 ZIP
Load Scenarios: Years 0-4 | Years 5-9 ZIP
Replications LOLE: Part 1 | Part 2 | Part 3 | Part 4 ZIP
 1.6.2023
Variable Resource Hourly Shapes CSV   5.16.2023
200CPx2 Hours XLS   1.6.2023
  Date
ELCC Class Ratings for 2024-2025 BRA PDF  12.28.2021
ELCC Report for December 2021 Results PDF
The following data files are described in the above ELCC Report:
Available Unlimited Thermal Scenarios: Years 0-8 ZIP
Load Scenarios: Years 0-3 | Years 4-8 ZIP
Replications LOLE: Part 1 | Part 2 | Part 3 ZIP
 12.28.2021
200CPx2 hours for the December 2021 ELCC Results XLS   12.28.2021
  Date
ELCC Class Ratings for 2023-2024 BRA PDF  12.16.2021
ELCC Report for July 2021 Results PDF
The following data files are described in the above ELCC Report:
Available Unlimited Thermal Scenarios: Years 0-7 ZIP
Load Scenarios: Years 0-3 | Years 4-7 ZIP
Replications LOLE: Year 0 | Year 1 | Years 2-7 ZIP
 12.16.2021
200CPx2 hours for the July 2021 ELCC Results XLS
10.22.2021
Weather Variables XLS  

Submit Your Input Data

PJM Connect WEB   Instructions: Signing In | Submitting Data | Dual Fuel Attestation PDF  

ELCC Data Submission Templates

Date
Wind Templates
Onshore | Offshore XLS
10.30.2020
Solar Template XLS  10.30.2020
Landfill Gas Template XLS  10.30.2020
Gen+Storage Hybrids XLS 10.30.2020
Battery & Flywheel Storage XLS 10.30.2020
   
Hydro  
Run of River Hydro without Storage Template XLS   10.30.2020
Hydro with Non-Pumped Storage XLS    2.9.2021
Pumped Storage Hydro Power XLS   2.9.2021