Maintenance to be performed 9/24; outage may be experienced

 PJM will be conducting maintenance on Monday, September 24 from 4:00 to 8:00 p.m. EPT.  There may be an outage to the interregional map, locational marginal pricing map, system map and proposed renewables projects map during this maintenance.

Interregional Data Map

Lake Erie Loop Flow
-9.1 MW
09.23.2018 10:08:55 EDT
PJM Real-Time Load: 74,277 MW
 
PJM (MISO): $23.66
2,147 / 2,082 MW
MISO LMP: $22.81
PJM (DEOK): $24.27
293 / 17 MW
Ohio Valley Electric Corporation (OVEC)
PJM (EKPC): $23.92
417 / 60 MW
Louisville Gas and Electric Company (LGEE)
PJM (AEP): $23.92
266 / 49 MW
Tennessee Valley Authority (TVA)
PJM (AEP): $23.92
120 / 0 MW
CPL Retail Energy West (CPLW)
PJM (AEP): $23.92
56 / 270 MW
Duke Energy
PJM (DOM): $23.92
815 / 145 MW
CPL Retail Energy East (CPLE)
PJM (Neptune): $23.26
660 / 660 MW
NYISO (Neptune): $24.76
PJM (Linden): $23.21
4 / 0 MW
NYISO (Linden): $24.51
PJM (Hudson): $24.06
480 / 480 MW
NYISO (Hudson): $24.55
PJM (NYISO): $23.31
689 / 616 MW
NYISO LMP: $23.15
LMP Values
(USD)
Interregional Map Legend the direction of actual flow Interregional Map Legend actual flow is from a lower interface price to
a higher interface price
Interregional Map Legend actual flow is from a higher interface price to
a lower interface price
Interregional Map Legend an interface without a corresponding
external interface price
Interregional Map Legend actual flow across interface Interregional Map Legend scheduled flow across interface

This map shows the flow of electricity into and out of PJM.  The details are zone based showing the flow, interfaces, prices and the real-time load (MW).