Temperature Adjustment for Steam Unit Ratings

PJM Manual 21 requires temperature adjustments of test results for combustion turbine and combined cycle units but does not explicitly require temperature adjustments for other types of units. A significant number of generation owners/operators choose not to temperature adjust their test results. In addition, Manual 21 permits hydroelectric generation owners to perform their unit verification tests at any time during the Delivery Year, rather than requiring them to perform the test over the summer period. These two rules in Manual 21 may result in generator ratings that over-state the actual output of some PJM units under peak summer conditions. The use of inaccurate generator ratings in planning studies will result in inaccurate study results.

Proposed Timeline

Issue initiated: 11.7.2013
Work begins: TBD
Target Completion: TBD
Actual Completion: TBD

Issue Details

Stakeholder Body Planning Committee
Subject Matter Expert Falin, Tom
Problem Statement/
Issue Charge First Read
10.10.2013
Issue Catalyst PJM
Issue Status Closed
Manual Changes Yes
Agreement Changes Open Access Transmission Tariff
  • Stakeholder Process Step

  • Completed Approved
  • Completed Education
  • Completed Interest
  • Completed Design
  • Completed Options
  • Completed Packages
  • Completed Consensus
  • Completed Review
  • Completed Completed
3.28.2014 -Filing-
Docket No. ER14-1609-000  PDF
5.23.2014 -Order-
Docket No. ER14-2289-000  PDF
8.14.2014 -Order-
Docket No. ER14-2289-000  PDF