Compliance Bulletins
Compliance Bulletins are a tool developed by PJM’s NERC department to provide clarity surrounding ambiguous language in the published NERC Reliability Standards and to provide guidance to the Standard Owners and members to assist with PJM’s compliance with the standards.
-
CB006 - PJM Control Room Interactions Clean PDF | Redline PDF
8.10.2023
This Compliance Bulletin provides an explanation of the interactions and coordination between operators in PJM’s control room as they relate to the NERC functional model responsibilities.
-
CB007 - NERC DADS Reporting Requirements for PJM & PJM Members Clean PDF | Redline PDF
3.18.2024
The purpose of this Compliance Bulletin is to outline the responsibilities of PJM and its members in regards to the NERC DADS reporting requirements.
-
CB017- NERC Standard PRC-005 Clean PDF | Redline PDF
8.16.2023
PJM issues this compliance bulletin in order to provide guidance for PJM Transmission Owners, Generator Owners, and Distribution Providers that are required to document and implement programs for the maintenance of all Protection Systems affecting the reliability of the Bulk Electric System (BES).
-
CB019 - NERC CIP-002-5.1 R1: CIP Assessment of Phasor Measurements Units & Synchrophasors Infrastructure Clean PDF
10.25.2023
-
CB020 – NERC Standards CIP-002, CIP-014, & FAC-014 Clean PDF | Redline PDF
3.1.2024
This Compliance Bulletin describes the process PJM implemented to identify assets that will serve as input to the analysis in support of compliance with NERC standards CIP-002, CIP-014, and FAC-014, in addition to discussing the process for coordinating and communicating to the Transmission Owners (TOs) the results of this analysis and for assisting as the third-party reviewer.
-
CB026 - Coordination with External Transmission Operators Clean PDF | Redline PDF
7.17.2023
The purpose of this Compliance Bulletin and the Coordination Guide in Attachment A is to document the approach that PJM as the registered TOP and the individual PJM Transmission Owners (TO) take to follow the applicable Requirements in the NERC Reliability Standards.
-
CB028 - NERC Standard FAC-001 - Facilities within a BA Area Clean PDF | Redline PDF
1.1.2024
NERC Standard FAC-001, R3.3 and R4.3 require that each Transmission Owner and applicable Generator Owner shall have procedures for confirming that their new or existing facilities seeking to make a qualified change as defined by the PC are within a BA Area.
-
CB029 - NERC Standard PRC-027 & other Protection & Control Series Standards Clean PDF | Redline PDF
7.7.2021
NERC Standard FAC-001-3, requirements R3.3 and R4.3 require that each Transmission Owner and applicable Generator Owner shall have procedures for confirming that their new or materially modified facilities are within a Balancing Authority Area’s metered boundaries.
Retired Bulletins