Allegheny Power Systems (Including the EDCs of West Pennsylvania Power, Monongahela Power and Potomac Edison) |
PJM Open Access Transmission Tariff (OATT) Attachments:
M-1 PDF
M-2 PDF |
First Energy Zones Attachments:
M-1 - Procedures for Determining a Load Serving Entity’s Hourly Energy Obligations
M-2 - Procedures for Determining a Load Serving Entity’s Peak Load Contribution and Network Service Peak Load
|
9.27.2013
|
Allegheny Electric Cooperative, Inc. |
|
Not applicable |
|
American Electric Power Company, Inc. (AEP) |
Company website |
The web page includes AEP’s process descriptions for transmission, capacity, hourly energy and unaccounted for energy calculations. |
February 2015
|
American Transmission Systems, Inc. (ATSI) (Including the EDCs of Ohio Edison, Pennsylvania Power, Toledo Edison and Cleveland Electric Illuminating) |
PJM OATT Attachments:
M-1 PDF
M-2 PDF
|
First Energy Zones Attachments:
M-1 - Procedures for Determining a Load Serving Entity’s Hourly Energy Obligations
M-2 - Procedures for Determining a Load Serving Entity’s Peak Load Contribution and Network Service Peak Load
|
9.27.2013
|
Atlantic City Electric Company |
PJM OATT Attachment:
M-2 PDF |
Attachment:
M-2 - Procedures for Determination of Peak Load Contributions and Hourly Load Obligations for Retail Customers
|
7.14.2011
|
Baltimore Gas and Electric Company (BGE) |
PJM OATT Attachment:
M-2 PDF |
Attachment:
M-2 - Methodologies used to determine Capacity Peak Load Contributions, Network Service Peak Load Contributions, Daily Peak Load Obligation, Daily Network Service Peak Load Obligation, and Hourly Load Obligations |
9.1.2014
|
Commonwealth Edison (ComEd) |
PJM OATT Attachment:
M-2 PDF |
Attachment:
M-2 - Methodologies used to determine Capacity Peak Load Contributions, Network Service Peak Load Contributions, Daily Peak Load Obligation, Daily Network Service Peak Load Obligation, and Hourly Load Obligations
|
1.4.2016
|
Dayton Power and Light Company |
|
Available upon request |
|
Delmarva Power and Light Company |
PJM OATT, Attachments:
M-2 PDF
|
Attachment:
M-2 - Procedures for Determination of Peak Load Contributions and Hourly Load Obligations for Retail Customers
|
7.14.2011
|
Dominion Virginia Power |
Company website |
The Capacity Peak Load Contribution and Network Service Peak Load Manual and Hourly Energy Obligation Manual are located under Operational Information within the Supplier Information Center.
|
|
Duke Energy Ohio and Kentucky |
Available upon request |
Duke provides this information in written format (not formulaic) upon request. |
|
Duquesne Light Company |
PA State Tariff |
See sections 5.1.3, 7, and 8. |
|
East Kentucky Power Cooperative (EKPC) |
|
EKPC is regulated by the Kentucky Public Service Commission. An explanation of our methodology will be provided to current or potential customers upon request. |
|
Jersey Central Power and Light Company (JCP&L) (Including the EDC of Jersey Central Power and Light) |
PJM OATT Attachments:
M-1 PDF
M-2 PDF |
First Energy Zones Attachments:
M-1 - Procedures for Determining a Load Serving Entity’s Hourly Energy Obligations
M-2 - Procedures for Determining a Load Serving Entity’s Peak Load Contribution and Network Service Peak Load
|
9.27.2013
|
Metropolitan Edison (Met-Ed) (Including the EDC of Metropolitan Edison) |
PJM OATT Attachments:
M-1 PDF
M-2 PDF
|
First Energy Zones Attachments:
M-1 - Procedures for Determining a Load Serving Entity’s Hourly Energy Obligations
M-2 - Procedures for Determining a Load Serving Entity’s Peak Load Contribution and Network Service Peak Load
|
9.27.2013
|
Old Dominion Electric Cooperative (ODEC) |
PJM OATT Attachments:
M-2 PDF
M-2 PDF |
ODEC’s annual transmission revenue requirement is included in the annual transmission revenue requirement and rate for Network Integration Transmission Service for the Delmarva Zone.
Delmarva Power and Light Company Attachment:
M-2 - Procedures for Determination of Peak Load Contributions and Hourly Load Obligations for Retail Customers |
7.14.2011
|
PPL Electric Utilities Corporation |
Company website |
- PPL Electric's zone peak load dates for the calculation of the 2011, 2012, 2013 and 2014 PLC calculations
- 2012, 2013 and 2014 capacity peak load calculators
- 2013 PLC default values and loss factors
- PLC development and application time table
- A narrative of how PPL Electric calculates customer PLCs
|
|
PECO Energy |
PJM OATT Attachment:
M-2 PDF |
Attachment:
M-2 - Process by which PECO determines Capacity Peak Load Contributions, or “PLCs”, Network Service Peak Loads, or “NSPLs”, and Final Hourly Load Obligations |
9.1.2014
|
Pennsylvania Electric Company (Penelec) (Including the EDC of Pennsylvania Electric Company) |
PJM OATT Attachments:
M-1 PDF
M-2 PDF
|
First Energy Zones Attachments:
M-1 - Procedures for Determining a Load Serving Entity’s Hourly Energy Obligations
M-2 - Procedures for Determining a Load Serving Entity’s Peak Load Contribution and Network Service Peak Load
|
9.27.2013
|
Public Service Gas and Electric Company (PSE&G) |
PJM OATT, Attachment:
M-2 PDF |
Attachment:
M-2 - Procedures for Determination of Peak Load Contributions and Hourly Load Obligations for Retail Customers
|
6.21.2017
|