Redacted Public Proposals for Current and Closed Windows


Proposal ID Target Zone Analysis Type Flowgates Project Description
768 AEP See Proposal See Proposal Axton - Joshua Falls - Mt Ida
12 PECO See Proposal See Proposal Competitive Window Upgrades
983 DOM See Proposal See Proposal 500kV Safety Solutions
17 PPL See Proposal See Proposal Bushkill - Kittatinny 230 kV line reconductor
533 ATSI See Proposal See Proposal Lemoyne - Lake Ave 345kV
72 PPL See Proposal See Proposal Juniata - Cumberland - Williams Grove 230 kV upgrade project
761 DOM See Proposal See Proposal J138/115 kV Safety Solutions
980 DOM See Proposal See Proposal Line #579 EOL Rebuild_Septa to Yadkin (99-2993)
312 PPL See Proposal See Proposal Acahela 500/230 kV Substation expansion project
330 PPL See Proposal See Proposal Juniata - Hunterstown 500 kV line
386 PPL See Proposal See Proposal Juniata - TMIS 500 kV DCT line
479 PPL See Proposal See Proposal Lackawanna - Paupack 230 kV line reconductor
526 PPL See Proposal See Proposal Jenkins - Pocono 230 kV line
549 PPL See Proposal See Proposal Susquehanna T10 Station Line Reconfiguration
850 PPL See Proposal See Proposal Pocono 80 MVAr 230 kV capacitor bank
860 PPL See Proposal See Proposal Face Rock T1 and T2 transformer replacement
24 DOM See Proposal See Proposal 230kV and 115kV Solutions for Portfolios
876 PPL See Proposal See Proposal Siegfried 500/230 kV Substation expansion project
922 PPL See Proposal See Proposal Lackawanna - Siegfried - Drakestown 500 kV line project
926 PPL See Proposal See Proposal Wescosville 2nd 500/138 kV transformer
935 PPL See Proposal See Proposal Juniata 500 kV Substation yard reconfiguration
390 DOM See Proposal See Proposal 230kV Safety Solutions
994 PPL See Proposal See Proposal Juniata - Dauphin 230 kV line reconductor
992 AEP/DOM See Proposal See Proposal Axton - Joshua Falls - Mt Ida 765kV transmission lines + Link 500/230kV substation
146 AEP/DOM See Proposal See Proposal Axton - Joshua Falls 765kV + Joshua Falls - Mt Ida 500kV
294 PPL See Proposal See Proposal Bay Shore - Davis-Besse - Lake Ave
357 AEP See Proposal See Proposal Bay Shore - Davis-Besse - Lake Ave + Lemoyne - Lake Ave 345kV
944 AEP/DOM See Proposal See Proposal Upgrades to AEP 138kV and Dominion 230kV transmission lines
873 DOM See Proposal See Proposal Line 8 Rebuild - Bremo to Scottsville Interconnection (APCO)
200 AEP/DOM See Proposal See Proposal Common Components
781 DOM See Proposal See Proposal 500kV Solutions for Portfolios
135 COMED See Proposal See Proposal Reconductor 345 kV lines 1202 & 1227 Dresden to Mulberry
447 COMED See Proposal See Proposal Cut 345 kV L8014 Pontiac to Dresden into Mulberry
967 DOM See Proposal See Proposal DVP Central Area Improvement for Portfolios
605 ATSI See Proposal See Proposal ATSI 138kV Rebuild + Substation Terminal Upgrades
502 APS See Proposal See Proposal Hunterstown #2 500/230 kV Transformer
843 ATSI See Proposal See Proposal Lemoyne - Lake Ave 345 kV Line
546 PPL/JCPL See Proposal See Proposal Pennsylvania Border - Drakestown 500 kV line (greenfield route)
900 PPL/JCPL See Proposal See Proposal Pennsylvania Border - Drakestown 500 kV line (brownfield route)
81 AEP See Proposal See Proposal Incumbent upgrades for Portfolio #1, 2 & 3
114 AEP/DOM/APS See Proposal See Proposal Joint Proposal
532 COMED See Proposal See Proposal 345kV Shunt Inductor at Mulberry
888 COMED See Proposal See Proposal Reconductor Des Plaines to Busse
816 COMED See Proposal See Proposal Autotransformer at Itasca
262 AEP/DOM/APS See Proposal See Proposal Joint Proposal
279 AEP/DOM/APS See Proposal See Proposal Joint Proposal
261 DOM See Proposal See Proposal Overdutied Breaker Replacement
527 DOM See Proposal See Proposal Cap Bank and STATCOM Installation
885 AEP/DOM/APS See Proposal See Proposal Components for Proposals 2024-W1-636, 610, 279 and 114
727 FE See Proposal See Proposal Kammer - 502 Junction 765 kV Line
977 APS See Proposal See Proposal Belmont - Harrison 500 kV Line
907 APS See Proposal See Proposal 500 kV Expansion Plan
232 APS See Proposal See Proposal FirstEnergy Upgrades to Support Portfolio Proposals
904 AEP/DOM/APS See Proposal See Proposal F1 Solution
955 PSEG See Proposal See Proposal 230kv Eagle Point - Penrose
132 PEPCO See Proposal See Proposal Dickerson H 230kV Caps
295 PEPCO See Proposal See Proposal Marley Neck 115 kV Substation
470 BGE See Proposal See Proposal GE local Mitigation Alternative
708 AEP/DOM/APS See Proposal See Proposal Amos - Welton Springs - Point of Rocks 765 kV Line
883 AEP/DOM/APS See Proposal See Proposal Amos - Welton Spring 765 kV Line
286 AEP/DOM See Proposal See Proposal Joshua Falls - Durandal
300 AEP/DOM See Proposal See Proposal Yeat - Vontay
350 AEP See Proposal See Proposal Jester - Hayden
167 AEP See Proposal See Proposal Leesville Station Conductor Replacement
738 AEP/DOM See Proposal See Proposal Boxwood-Bremo 138 kV Rebuild
949 AEP See Proposal See Proposal Boxwood-Bremo 138 kV Sag Study and Partial Rebuild
551 APS See Proposal See Proposal Chanceford - Goose Creek 500 kV Line
856 AEP See Proposal See Proposal Canal - Mound Street 138 kV Rebuild
769 AEP See Proposal See Proposal Rebuild Beatty-Cyprus 138 kV Line
464 AEP See Proposal See Proposal Genoa-Westar Sag Remediation
117 AEP See Proposal See Proposal Tidd-Mahans Lane 138 kV Rebuild
574 AEP See Proposal See Proposal Tiltonsville-West Bellaire 138 kV Rebuild
940 AEP See Proposal See Proposal Canal - Gay 138 kV Rebuild
622 AEP/DOM/APS See Proposal See Proposal F2 Solution
898 AEP/DOM/APS See Proposal See Proposal F3 Solution
124 AEP/DOM/APS See Proposal See Proposal F4 Solution
78 AEP/DOM/APS See Proposal See Proposal F5 Solution
506 AEP/DOM/APS See Proposal See Proposal F6 Solution
317 AEP/DOM/APS See Proposal See Proposal F7 Solution
839 AEP/DOM/APS See Proposal See Proposal F8 Solution
744 AEP See Proposal See Proposal Maliszewski-Polaris Rebuild
338 AEP See Proposal See Proposal Genoa-Westar Rebuild
276 AEP See Proposal See Proposal Bixby - Buckeye Steel 138 kV Reconfiguration
756 AEP See Proposal See Proposal Cyprus Station Reconfiguration
863 AEP See Proposal See Proposal Maliszewski Series Reactor Upgrades
408 AEP See Proposal See Proposal Maliszewski 765/345 kV Upgrades
610 AEP/DOM/APS See Proposal See Proposal Joint Proposal
459 AEP See Proposal See Proposal Mountaineer and Belmont Station Upgrades
617 AEP See Proposal See Proposal Incumbent upgrades for Portfolio #4
636 AEP/DOM/APS See Proposal See Proposal Joint Proposal
665 AEP/DOM See Proposal See Proposal Joshua Falls - Vontay - Morrisville South
694 AEP/DOM/APS See Proposal See Proposal Fostoria Central - Lake Ave. 345 kV DC
759 AEP/DOM/APS See Proposal See Proposal Joint Proposal
820 AEP/DOM See Proposal See Proposal Joshua Falls - Yeat

Proposal ID Target Zone Analysis Type Flowgates Project Description
367 Dominion End of Life Criteria 2023W2-DOM-O1 Line #588 Yadkin-Fentress EOL Rebuild
627 PSEG Thermal 2023W2-PSEG-T15, 2023W2-PSEG-T14, 2023W2-PSEG-T13, 2023W2-PSEG-T9, 2023W2-PSEG-T8, 2023W2-PSEG-T5, 2023W2-PSEG-T6, 2023W2-PSEG-T3, 2023W2-PSEG-T4, 2023W2-PSEG-T1, 2023W2-PSEG-T10, 2023W2-PSEG-T2 Jackson Road 230kV Station to Cedar Grove 230kV Station (5000kcmil cable)
998 PSEG Thermal 2023W2-PSEG-T15, 2023W2-PSEG-T14, 2023W2-PSEG-T13, 2023W2-PSEG-T9, 2023W2-PSEG-T8, 2023W2-PSEG-T5, 2023W2-PSEG-T6, 2023W2-PSEG-T3, 2023W2-PSEG-T4, 2023W2-PSEG-T1, 2023W2-PSEG-T10, 2023W2-PSEG-T2 69kV Circuit Reinforcement from Cedar Grove to Jackson Road
496 PSEG Thermal 2023W2-PSEG-T15, 2023W2-PSEG-T14, 2023W2-PSEG-T13, 2023W2-PSEG-T9, 2023W2-PSEG-T8, 2023W2-PSEG-T5, 2023W2-PSEG-T6, 2023W2-PSEG-T3, 2023W2-PSEG-T4, 2023W2-PSEG-T1, 2023W2-PSEG-T10, 2023W2-PSEG-T2 Jackson Road 230kV Station to Cedar Grove 230kV Station (3500kcmil cable)
716 PSEG Thermal 2023W2-PSEG-T15, 2023W2-PSEG-T14, 2023W2-PSEG-T13, 2023W2-PSEG-T9, 2023W2-PSEG-T8, 2023W2-PSEG-T5, 2023W2-PSEG-T6, 2023W2-PSEG-T3, 2023W2-PSEG-T4, 2023W2-PSEG-T1, 2023W2-PSEG-T10, 2023W2-PSEG-T2 Montville - Jackson Rd 230 kV line project
343 AEP Gen Deliv., Thermal 2023W2-N1-ST21, 2023W2-N1-ST20, 2023W2-N1-ST23, 2023W2-N1-ST22, 2023W2-N1-ST25, 2023W2-GD-S165, 2023W2-N1-ST24, 2023W2-N1-ST27, 2023W2-N1-ST26, 2023W2-N2-ST32, 2023W2-N1-ST19, 2023W2-N2-ST33, 2023W2-N2-ST30, 2023W2-N2-ST31, 2023W2-N2-ST38, 2023W2-N2-ST39, 2023W2-N2-ST36, 2023W2-N2-ST37, 2023W2-N2-ST34, 2023W2-N2-ST35, 2023W2-GD-S170, 2023W2-N1-ST10, 2023W2-N1-ST12, 2023W2-N1-ST11, 2023W2-N1-ST14, 2023W2-N1-ST13, 2023W2-N1-ST16, 2023W2-N1-ST15, 2023W2-N1-ST18, 2023W2-N1-ST17, 2023W2-N1-ST1, 2023W2-N2-ST21, 2023W2-N2-ST22, 2023W2-N1-ST3, 2023W2-N1-ST2, 2023W2-N2-ST20, 2023W2-N1-ST5, 2023W2-N1-WT1, 2023W2-N1-ST4, 2023W2-N1-ST7, 2023W2-N1-WT3, 2023W2-N1-ST6, 2023W2-N1-WT2, 2023W2-N2-ST29, 2023W2-N2-ST27, 2023W2-N2-ST28, 2023W2-N2-ST25, 2023W2-N2-ST26, 2023W2-N2-ST23, 2023W2-N2-ST24, 2023W2-GD-S4, 2023W2-GD-S3, 2023W2-GD-S186, 2023W2-N2-WT8, 2023W2-N2-WT7, 2023W2-N2-ST50, 2023W2-N2-WT6, 2023W2-N2-ST9, 2023W2-N2-WT5, 2023W2-N2-ST8, 2023W2-N2-WT4, 2023W2-N2-ST7, 2023W2-N2-WT3, 2023W2-GD-W154, 2023W2-GD-W155, 2023W2-GD-W153, 2023W2-GD-W156, 2023W2-GD-S115, 2023W2-GD-S114, 2023W2-N2-ST43, 2023W2-N2-ST44, 2023W2-N2-ST41, 2023W2-N2-ST42, 2023W2-N2-ST40, 2023W2-N2-ST49, 2023W2-N2-ST47, 2023W2-N2-ST48, 2023W2-GD-S6, 2023W2-N2-ST45, 2023W2-N2-ST46, 2023W2-GD-W162, 2023W2-GD-W165, 2023W2-GD-W163, 2023W2-GD-W164, 2023W2-GD-S122, 2023W2-GD-S121, 2023W2-GD-S123, 2023W2-GD-S126, 2023W2-GD-S125, 2023W2-GD-S116, 2023W2-GD-W59, 2023W2-GD-W58, 2023W2-N1-WT10, 2023W2-N1-WT13, 2023W2-N1-WT14, 2023W2-N1-WT11, 2023W2-N1-WT12, 2023W2-GD-W213, 2023W2-N2-ST6, 2023W2-N2-WT2, 2023W2-GD-W214, 2023W2-N2-ST5, 2023W2-N2-WT1, 2023W2-N2-ST4, 2023W2-N2-ST3, 2023W2-GD-S135, 2023W2-GD-W217, 2023W2-N2-ST2, 2023W2-N2-ST1, 2023W2-GD-W215, 2023W2-GD-W216, 2023W2-GD-S127, 2023W2-N1-ST9, 2023W2-N1-WT5, 2023W2-GD-S141, 2023W2-N1-ST8, 2023W2-N1-WT4, 2023W2-N1-WT7, 2023W2-N1-WT6, 2023W2-N1-WT9, 2023W2-N1-WT8, 2023W2-N2-ST11, 2023W2-N2-ST10, 2023W2-N2-ST17, 2023W2-N2-ST16, 2023W2-N2-ST19, 2023W2-N2-ST18, 2023W2-N2-ST13, 2023W2-N2-ST12, 2023W2-N2-ST15, 2023W2-N2-ST14, 2023W2-GD-W19, 2023W2-GD-W25 Jester - Hayden
27 AEP Gen Deliv., Thermal 2023W2-N1-ST21, 2023W2-N1-ST20, 2023W2-N1-ST23, 2023W2-N1-ST22, 2023W2-N1-ST25, 2023W2-GD-S165, 2023W2-N1-ST24, 2023W2-N1-ST27, 2023W2-N1-ST26, 2023W2-N2-ST32, 2023W2-N1-ST19, 2023W2-N2-ST33, 2023W2-N2-ST30, 2023W2-N2-ST31, 2023W2-N2-ST38, 2023W2-N2-ST39, 2023W2-N2-ST36, 2023W2-N2-ST37, 2023W2-N2-ST34, 2023W2-N2-ST35, 2023W2-N1-ST10, 2023W2-N1-ST12, 2023W2-N1-ST11, 2023W2-N1-ST14, 2023W2-N1-ST13, 2023W2-N1-ST16, 2023W2-N1-ST15, 2023W2-N1-ST18, 2023W2-N1-ST17, 2023W2-N1-ST1, 2023W2-N2-ST21, 2023W2-N2-ST22, 2023W2-N1-ST3, 2023W2-N1-ST2, 2023W2-N2-ST20, 2023W2-N1-ST5, 2023W2-N1-WT1, 2023W2-N1-ST4, 2023W2-N1-ST7, 2023W2-N1-WT3, 2023W2-N1-ST6, 2023W2-N1-WT2, 2023W2-N2-ST29, 2023W2-N2-ST27, 2023W2-N2-ST28, 2023W2-N2-ST25, 2023W2-N2-ST26, 2023W2-N2-ST23, 2023W2-N2-ST24, 2023W2-GD-S4, 2023W2-GD-S3, 2023W2-GD-S186, 2023W2-N2-WT8, 2023W2-N2-WT7, 2023W2-N2-ST50, 2023W2-N2-WT6, 2023W2-N2-ST9, 2023W2-N2-WT5, 2023W2-N2-ST8, 2023W2-N2-WT4, 2023W2-N2-ST7, 2023W2-N2-WT3, 2023W2-GD-W154, 2023W2-GD-W155, 2023W2-GD-W153, 2023W2-GD-W156, 2023W2-GD-S115, 2023W2-GD-S114, 2023W2-N2-ST43, 2023W2-N2-ST44, 2023W2-N2-ST41, 2023W2-N2-ST42, 2023W2-N2-ST40, 2023W2-N2-ST49, 2023W2-N2-ST47, 2023W2-N2-ST48, 2023W2-GD-S6, 2023W2-N2-ST45, 2023W2-N2-ST46, 2023W2-GD-W162, 2023W2-GD-W165, 2023W2-GD-W163, 2023W2-GD-W164, 2023W2-GD-S122, 2023W2-GD-S121, 2023W2-GD-S123, 2023W2-GD-S126, 2023W2-GD-S125, 2023W2-GD-S116, 2023W2-GD-W59, 2023W2-N1-WT10, 2023W2-N1-WT13, 2023W2-N1-WT14, 2023W2-N1-WT11, 2023W2-N1-WT12, 2023W2-N2-ST6, 2023W2-N2-WT2, 2023W2-GD-W214, 2023W2-N2-ST5, 2023W2-N2-WT1, 2023W2-N2-ST4, 2023W2-N2-ST3, 2023W2-GD-S135, 2023W2-GD-W217, 2023W2-N2-ST2, 2023W2-N2-ST1, 2023W2-GD-W215, 2023W2-GD-W216, 2023W2-GD-S127, 2023W2-N1-ST9, 2023W2-N1-WT5, 2023W2-GD-S141, 2023W2-N1-ST8, 2023W2-N1-WT4, 2023W2-N1-WT7, 2023W2-N1-WT6, 2023W2-N1-WT9, 2023W2-N1-WT8, 2023W2-N2-ST11, 2023W2-N2-ST10, 2023W2-N2-ST17, 2023W2-N2-ST16, 2023W2-N2-ST19, 2023W2-N2-ST18, 2023W2-N2-ST13, 2023W2-N2-ST12, 2023W2-N2-ST15, 2023W2-N2-ST14, 2023W2-GD-W19, 2023W2-GD-W25 Barron Transmission Project
117 AEP Gen Deliv., Thermal 2023W2-N1-ST21, 2023W2-N1-ST20, 2023W2-N1-ST23, 2023W2-N1-ST22, 2023W2-N1-ST25, 2023W2-GD-S165, 2023W2-N1-ST24, 2023W2-N1-ST27, 2023W2-N1-ST26, 2023W2-N2-ST32, 2023W2-N1-ST19, 2023W2-N2-ST33, 2023W2-N2-ST30, 2023W2-N2-ST31, 2023W2-N2-ST38, 2023W2-N2-ST39, 2023W2-N2-ST36, 2023W2-N2-ST37, 2023W2-N2-ST34, 2023W2-N2-ST35, 2023W2-N1-ST10, 2023W2-N1-ST12, 2023W2-N1-ST11, 2023W2-N1-ST14, 2023W2-N1-ST13, 2023W2-N1-ST16, 2023W2-N1-ST15, 2023W2-N1-ST18, 2023W2-N1-ST17, 2023W2-N1-ST1, 2023W2-N2-ST21, 2023W2-N2-ST22, 2023W2-N1-ST3, 2023W2-N1-ST2, 2023W2-N2-ST20, 2023W2-N1-ST5, 2023W2-N1-WT1, 2023W2-N1-ST4, 2023W2-N1-ST7, 2023W2-N1-WT3, 2023W2-N1-ST6, 2023W2-N1-WT2, 2023W2-N2-ST29, 2023W2-N2-ST27, 2023W2-N2-ST28, 2023W2-N2-ST25, 2023W2-N2-ST26, 2023W2-N2-ST23, 2023W2-N2-ST24, 2023W2-GD-S4, 2023W2-GD-S3, 2023W2-GD-S186, 2023W2-N2-WT8, 2023W2-N2-WT7, 2023W2-N2-ST50, 2023W2-N2-WT6, 2023W2-N2-ST9, 2023W2-N2-WT5, 2023W2-N2-ST8, 2023W2-N2-WT4, 2023W2-N2-ST7, 2023W2-N2-WT3, 2023W2-GD-W154, 2023W2-GD-W155, 2023W2-GD-W153, 2023W2-GD-W156, 2023W2-GD-S115, 2023W2-GD-S114, 2023W2-N2-ST44, 2023W2-N2-ST41, 2023W2-N2-ST42, 2023W2-N2-ST40, 2023W2-N2-ST49, 2023W2-N2-ST47, 2023W2-N2-ST48, 2023W2-GD-S6, 2023W2-N2-ST45, 2023W2-N2-ST46, 2023W2-GD-W162, 2023W2-GD-W165, 2023W2-GD-W163, 2023W2-GD-W164, 2023W2-GD-S122, 2023W2-GD-S121, 2023W2-GD-S123, 2023W2-GD-S126, 2023W2-GD-S125, 2023W2-GD-S116, 2023W2-GD-W59, 2023W2-N1-WT10, 2023W2-N1-WT13, 2023W2-N1-WT14, 2023W2-N1-WT11, 2023W2-N1-WT12, 2023W2-N2-ST6, 2023W2-N2-WT2, 2023W2-GD-W214, 2023W2-N2-ST5, 2023W2-N2-WT1, 2023W2-N2-ST4, 2023W2-N2-ST3, 2023W2-GD-S135, 2023W2-GD-W217, 2023W2-N2-ST2, 2023W2-N2-ST1, 2023W2-GD-W215, 2023W2-GD-W216, 2023W2-GD-S127, 2023W2-N1-ST9, 2023W2-N1-WT5, 2023W2-GD-S141, 2023W2-N1-ST8, 2023W2-N1-WT4, 2023W2-N1-WT7, 2023W2-N1-WT6, 2023W2-N1-WT9, 2023W2-N1-WT8, 2023W2-N2-ST11, 2023W2-N2-ST10, 2023W2-N2-ST16, 2023W2-N2-ST19, 2023W2-N2-ST13, 2023W2-N2-ST12, 2023W2-N2-ST15, 2023W2-N2-ST14, 2023W2-GD-W19, 2023W2-GD-W25 Vassell 765/345 kV Transformer Addition and Maliszewski Breaker Replacement
596 AEP Gen Deliv., Thermal 2023W2-GD-S186, 2023W2-GD-S141, 2023W2-N2-WT1, 2023W2-N2-ST4, 2023W2-N2-ST2, 2023W2-N1-ST15, 2023W2-N2-ST1, 2023W2-N2-ST30, 2023W2-N2-ST31, 2023W2-N2-WT4, 2023W2-N2-ST7, 2023W2-N2-ST28, 2023W2-N2-ST39, 2023W2-N2-ST37, 2023W2-N2-ST48, 2023W2-N2-ST46 Genoa-Westar Sag Remediation
561 AEP Gen Deliv. 2023W2-GD-S170, 2023W2-GD-S142, 2023W2-GD-W213, 2023W2-GD-W58 RP Mone-Maddox Creek Reconductor
957 AEP Gen Deliv., Thermal 2023W2-GD-S170, 2023W2-GD-S142, 2023W2-GD-W213, 2023W2-GD-W58 RP Mone-Maddox Creek Rebuild
729 AEP Gen Deliv., Thermal 2023W2-GD-S186, 2023W2-GD-S141, 2023W2-N2-WT1, 2023W2-N2-ST4, 2023W2-N2-ST2, 2023W2-N1-ST15, 2023W2-N2-ST1, 2023W2-N2-ST30, 2023W2-N2-ST31, 2023W2-N2-WT4, 2023W2-N2-ST7, 2023W2-N2-ST28, 2023W2-N2-ST39, 2023W2-N2-ST37, 2023W2-N2-ST48, 2023W2-N2-ST46 Genoa-Westar Rebuild
188 AEP Gen Deliv., Thermal 2023W2-N2-ST6, 2023W2-N2-ST5, 2023W2-N1-ST14, 2023W2-GD-S165, 2023W2-N1-ST13, 2023W2-N2-ST3, 2023W2-GD-S135, 2023W2-N2-ST32, 2023W2-N2-ST43, 2023W2-N2-ST22, 2023W2-N2-ST44, 2023W2-N2-ST40, 2023W2-N2-WT5, 2023W2-N2-ST8, 2023W2-N2-WT3, 2023W2-N2-ST17, 2023W2-N2-ST49, 2023W2-N2-ST18, 2023W2-N2-ST13, 2023W2-N2-ST25, 2023W2-N2-ST47, 2023W2-N2-ST24 Maliszewski-Polaris Reconductor
340 AEP Gen Deliv., Thermal 2023W2-N2-ST6, 2023W2-N2-ST5, 2023W2-N1-ST14, 2023W2-GD-S165, 2023W2-N1-ST13, 2023W2-N2-ST3, 2023W2-GD-S135, 2023W2-N2-ST32, 2023W2-N2-ST43, 2023W2-N2-ST22, 2023W2-N2-ST44, 2023W2-N2-ST40, 2023W2-N2-WT5, 2023W2-N2-ST8, 2023W2-N2-WT3, 2023W2-N2-ST17, 2023W2-N2-ST49, 2023W2-N2-ST18, 2023W2-N2-ST13, 2023W2-N2-ST25, 2023W2-N2-ST47, 2023W2-N2-ST24 Maliszewski-Polaris Rebuild
340 AEP Gen Deliv., Thermal 2023W2-N2-ST6, 2023W2-N2-ST5, 2023W2-N1-ST14, 2023W2-GD-S165, 2023W2-N1-ST13, 2023W2-N2-ST3, 2023W2-GD-S135, 2023W2-N2-ST32, 2023W2-N2-ST43, 2023W2-N2-ST22, 2023W2-N2-ST44, 2023W2-N2-ST40, 2023W2-N2-WT5, 2023W2-N2-ST8, 2023W2-N2-WT3, 2023W2-N2-ST17, 2023W2-N2-ST49, 2023W2-N2-ST18, 2023W2-N2-ST13, 2023W2-N2-ST25, 2023W2-N2-ST47, 2023W2-N2-ST24 Maliszewski-Polaris Rebuild
683 AEP Gen Deliv. 2023W2-GD-W12 Allen-RP Mone Sag Mitigations
169 AEP Gen Deliv. 2023W2-GD-W12 Allen-RP Mone Reconductor
819 AEP Gen Deliv. 2023W2-GD-W12 Allen-RP Mone Reconductor
11 AEP Gen Deliv. 2023W2-GD-S170, 2023W2-GD-S142, 2023W2-GD-W12, 2023W2-GD-W213, 2023W2-GD-W58 East Lima Phase Shifting Transformer
334 AEP Gen Deliv. 2023W2-GD-S170, 2023W2-GD-S142, 2023W2-GD-W12, 2023W2-GD-W213, 2023W2-GD-W58 Sorenson-Maddox Circuit Addition
426 AEP Gen Deliv. 2023W2-N2-ST50, 2023W2-N2-ST9, 2023W2-N2-ST16, 2023W2-N2-ST34, 2023W2-N2-ST45 Genoa-Spring Road Sag Mitigation
92 AEP Gen Deliv. 2023W2-N2-ST11, 2023W2-N2-ST41, 2023W2-N2-WT8, 2023W2-N2-ST10, 2023W2-N2-WT7, 2023W2-N2-ST36, 2023W2-N2-ST12, 2023W2-N2-ST23, 2023W2-N2-ST14 Polaris-Westar Rebuild

Proposal ID Target Zone Analysis Type Flowgate Project Description
35 ComEd Summer, Gen Deliv 2023W1-GD-S554, 2023W1-GD-S1259, 2023W1-GD-S571, 2023W1-GD-S563, 2023W1-GD-S1260, 2023W1-GD-S570, 2023W1-GD-S190, 2023W1-GD-S548 Reconductor 18.7 miles of 345 kV lines 11620 & 11622 from Elwood to Goodings Grove with two conductor bundled 1033.5 ACSS conductor. Modify and replace towers as necessary to accommodate the higher mechanical loads of the bundled conductor.
107 PSEG Light Load Voltage Mag 2023W1-N1-LLVM1, 2023W1-N1-LLVM23, 2023W1-N1-LLVM2, 2023W1-N1-LLVM24, 2023W1-N1-LLVM21, 2023W1-N1-LLVM3, 2023W1-N1-LLVM22, 2023W1-N1-LLVM4, 2023W1-N1-LLVM20, 2023W1-N1-LLVM9, 2023W1-N1-LLVM5, 2023W1-N1-LLVM6, 2023W1-N1-LLVM7, 2023W1-N1-LLVM8, 2023W1-N1-LLVM29, 2023W1-N1-LLVM27, 2023W1-N1-LLVM28, 2023W1-N1-LLVM25, 2023W1-N1-LLVM26, 2023W1-N1-LLVM12, 2023W1-N1-LLVM34, 2023W1-N1-LLVM13, 2023W1-N1-LLVM35, 2023W1-N1-LLVM10, 2023W1-N1-LLVM32, 2023W1-N1-LLVM11, 2023W1-N1-LLVM33, 2023W1-N1-LLVM30, 2023W1-N1-LLVM31, 2023W1-N1-LLVM18, 2023W1-N1-LLVM19, 2023W1-N1-LLVM16, 2023W1-N1-LLVM38, 2023W1-N1-LLVM17, 2023W1-N1-LLVM14, 2023W1-N1-LLVM36, 2023W1-N1-LLVM15, 2023W1-N1-LLVM37 Replace existing 230kV 50MVAR fixed shunt reactor with a 230kV 150MVAR variable shunt reactor. Replace existing 345kV 100MVAR fixed shunt reactor with a 345kV 150MVAR variable shunt reactor.
138 ComEd Summer, Gen Deliv 2023W1-GD-S554, 2023W1-GD-S1259, 2023W1-GD-S571, 2023W1-GD-S563, 2023W1-GD-S1260, 2023W1-GD-S570, 2023W1-GD-S190, 2023W1-GD-S548 Install two new 345 kV circuits from Elwood to Joliet for a distance of approximately 8 miles.
158 PENELEC Summer Individual Plant Test 2023W1-IPD-S24, 2023W1-IPD-S21, 2023W1-IPD-S20 Rebuild North Meshoppen - Mehoopany #2 115 kV Line
384 AEP Short Circuit 2023W1-SC-4 Replace the overdutied Olive 345kV circuit breaker "D" with a 5000A 63 kA circuit breaker. No steady state ratings or contingency changes are anticipated for this proposal.
500 ComEd Winter Gen Deliv 2023W1-GD-W229, 2023W1-GD-W955, 2023W1-GD-W988, 2023W1-GD-W945, 2023W1-GD-W993, 2023W1-GD-W268, 2023W1-GD-W972, 2023W1-GD-W1397, 2023W1-GD-W1387, 2023W1-GD-W946 Expand Haumesser Road substation. Extend the line 11323 West Dekalb tap 1.6 miles into Haumesser Road to create new line 9411 from Haumesser to West Dekalb. Expand West Dekalb to tie line 9411 from Haumesser Road to the existing line 8315 from Glidden. Reconductor/rebuild 10 miles of line 9411 and 6 miles of line 8315.
573 DPL Summer Individual Plant Test 2023W1-IPD-S10, 2023W1-IPD-S11, 2023W1-IPD-S18, 2023W1-IPD-S19, 2023W1-IPD-S16, 2023W1-GD-S765, 2023W1-IPD-S17, 2023W1-IPD-S14, 2023W1-IPD-S15, 2023W1-IPD-S12, 2023W1-IPD-S13, 2023W1-GD-S803, 2023W1-GD-S802, 2023W1-IPD-S29, 2023W1-GD-S158, 2023W1-IPD-S27, 2023W1-GD-S798, 2023W1-IPD-S28, 2023W1-GD-S1436, 2023W1-IPD-S26, 2023W1-IPD-S9, 2023W1-IPD-S8, 2023W1-IPD-S7, 2023W1-IPD-S6, 2023W1-IPD-S5, 2023W1-IPD-S4, 2023W1-IPD-S3, 2023W1-IPD-S2, 2023W1-IPD-S1 Reconductor Silver Run - Cedar Creek 230kV line. Upgrade bushing, disconnect, stranded bus, and rigid bus at Cedar Creek substation. Upgrade 1590 ACSR "Lapwing" jumper and disconnect at Silver Run substation.
605 APS Summer Gen Deliv 2023W1-GD-S499, 2023W1-GD-S500, 2023W1-GD-S501, 2023W1-GD-S87, 2023W1-GD-S89, 2023W1-GD-S80 This project assumes a previous award of Project #904 from the 2022 RTEP Window #3. This project enhances Project #904 by increasing the throughput of power by increasing the line conductor ampacity, and the attached terminal equipment. The enhanced conductor and terminal equipment will increase from 4000A to 5000A capacity.
663 ComEd Summer Gen Deliv 2023W1-GD-S554, 2023W1-GD-S1259, 2023W1-GD-S571, 2023W1-GD-S563, 2023W1-GD-S1260, 2023W1-GD-S570, 2023W1-GD-S190, 2023W1-GD-S548 The Elwood - Joliet 345kV transmission project consists of an approximately 4 mile double circuit 345kV transmission line from the Elwood Substation to the Joliet Substation.
712 ComEd Winter Gen Deliv 2023W1-GD-W229, 2023W1-GD-W955, 2023W1-GD-W988, 2023W1-GD-W945, 2023W1-GD-W993, 2023W1-GD-W268, 2023W1-GD-W972, 2023W1-GD-W1397, 2023W1-GD-W1387, 2023W1-GD-W946 Rebuild/reconductor 138 kV line 11323 from Haumesser Road to the H-452 tap.
746 PENELEC Summer Individual Plant Test 2023W1-IPD-S25, 2023W1-IPD-S23, 2023W1-IPD-S22 Rebuild North Meshoppen - Mehoopany #1 115 kV Line
771 ComEd Summer Gen Deliv 2023W1-GD-S641, 2023W1-GD-S663, 2023W1-GD-S642, 2023W1-GD-S662, 2023W1-GD-S1262, 2023W1-GD-S1263 Add three 345 kV circuit breakers to Cherry Valley substation.
831 APS Summer Gen Deliv 2023W1-GD-S499, 2023W1-GD-S500, 2023W1-GD-S501, 2023W1-GD-S87, 2023W1-GD-S89, 2023W1-GD-S80 Polecat Station is a 765/500kV Station that features a 765kV three-position ring bus and a 500kV three-position ring bus. The 765kV ring bus connects Belmont-Mountaineer 765kV, Kammer 765kV, and a new 2620MVA SE transformer. The 500kV ring bus connects the new 2620MVA SE transformer, Belmont 500kV, and Flint Run 500kV transmission lines. 765kV circuit breaker upgrades will be completed at Mountaineer Station to meet the required 5000A rating.
850 APS Summer Gen Deliv 2023W1-GD-S499, 2023W1-GD-S500, 2023W1-GD-S501, 2023W1-GD-S87, 2023W1-GD-S89, 2023W1-GD-S80 Install second 765/500 kV transformer (#6) with nameplate rating of 1080/1440/1800 MVA (ONAN/ONAF/ONAF), consisting of three single-phase transformers and a spare unit, in parallel with the existing Transformer #5. The loadability ratings of the new transformer #6 are 2351/3148/3600 SN/SE/SLD and 2754/3380/3600 WN/WE/WLD. Install 765 kV four-breaker ring bus and two 500 kV breakers. Replace 500 kV disconnect switches.
851 APS Summer Gen Deliv 2023W1-GD-S499, 2023W1-GD-S500, 2023W1-GD-S501, 2023W1-GD-S87, 2023W1-GD-S89, 2023W1-GD-S80 Cork 765kV greenfield substation facilitates the upgrade of FirstEnergy’s Belmont 765/500kV transformer while resolving Mountaineer equipment overduty, and concerns deriving from the existing three terminal line of Mountaineer – Belmont – Kammer 765kV.
903 APS Summer Gen Deliv 2023W1-GD-S499, 2023W1-GD-S500, 2023W1-GD-S501, 2023W1-GD-S87, 2023W1-GD-S89, 2023W1-GD-S80 Replace the Belmont 765/500 kV Transformer #5 with a new transformer bank with nameplate rating of 1500/2000/2500 MVA (ONAN/ONAF/ONAF), consisting of three single-phase transformers and a spare transformer. The loadability ratings of the new transformer are 3125/4000/4750 SN/SE/SLD and 3500/4250/4750 WN/WE/WLD. Replace 500 kV disconnect switches.
905 APS Summer Gen Deliv 2023W1-GD-S499, 2023W1-GD-S500, 2023W1-GD-S501, 2023W1-GD-S87, 2023W1-GD-S89, 2023W1-GD-S80 Add (2) 765kV breakers at Joshua Falls to create a 2-breaker ring with the transformer still connected off the bus. Remove CT and RTL limits to bring both 765kV lines up to the 3000A wavetrap rating. Construct new Yeat 765/500/230kV station near existing Bristers 500/230kV substation. This substation will have (10) 500kV breakers, (2) 765/500kV transformers, (2) 500/230kV transformers, (2) 230kV CB’s and (1) 765kV CB. Construct 135-mile single circuit 765kV greenfield line connecting Joshua Falls 765kV and new Greenfield Yeat 765kV stations. Cut in Bristers–Ox 500kV and Meadowbrook–Vint Hill 500kV lines into Yeat’s 500kV yard. AEP installs a new 12-mile dbl ckt BOLD (Breakthrough Overhead Line Design) 230kV line from Yeat–CloverHIll. Dominion installs a new 7.5-mile dbl ckt BOLD (Breakthrough Overhead Line Design) 230kV line from Warrenton–Wheeler. Dominion installs new 0.1% reactor at Vinthill on Vinthill–Morrisville. Dominion Install new 0.1% reactor at Vinthill on Vinthill–Loudoun 1. Dominion Rebuilds 1.7 miles 230kV line from Marsh Run–RemingtonCt as double circuit. Dominion replaces remote end equipment to bring rating up on 230kV line from Wheeler–Linton Tap–Atlantic. Dominion rebuilds the 0.23-mile line between Bristers 500kV and Yeat 500kV. Dominion installs (2) 230kV breakers at Wheeler substation.
929 DLCO Light Load Gen Deliv 2023W1-GD-LL905, 2023W1-GD-LL550 Reconductor the limiting segments of the DLC-owned portion of the Cheswick-Wycoff Tap segment of the Cheswick-Yukon (Z-65) 138 kV tie-line (approximately 1.5 miles).
937 ComEd Summer Gen Deliv 2023W1-GD-S554, 2023W1-GD-S1259, 2023W1-GD-S571, 2023W1-GD-S563, 2023W1-GD-S1260, 2023W1-GD-S570, 2023W1-GD-S190, 2023W1-GD-S548 Apply conductor coating to lines 11620 & 11622 from Elwood to Goodings Grove. The coating increases emissivity and reduces absorptivity of the conductor, allowing for increased ratings. This technology was presented at PJM's Emergin